Project Description

PROJECT DESCRIPTION

This project consisted of the construction of a new Tube Park, which included a lodge and a tube run equipped with a 790′ conveyor lift.  In addition, a wobble trap shooting range was built behind the lodge for use during the non-ski season.  Also a part of this project was the construction of a new Beginner’s Slope adjacent to the existing Main Ski Lodge.  It was also equipped with a shorter (500′) conveyor lift.  Other than the construction of the various structures, extensive Site Work was also required for underground utilities/drainage and grading of the two slopes.

PROJECT DETAILS

Client: WVDNR

Project Date: 2012

Services Used:

  • New Construction
  • Site Work
  • Concrete
  • Masonry
  • Carpentry