Project Description
PROJECT DESCRIPTION
This project consisted of the construction of a new Tube Park, which included a lodge and a tube run equipped with a 790′ conveyor lift. In addition, a wobble trap shooting range was built behind the lodge for use during the non-ski season. Also a part of this project was the construction of a new Beginner’s Slope adjacent to the existing Main Ski Lodge. It was also equipped with a shorter (500′) conveyor lift. Other than the construction of the various structures, extensive Site Work was also required for underground utilities/drainage and grading of the two slopes.
PROJECT DETAILS
Client: WVDNR
Project Date: 2012
Services Used:
- New Construction
- Site Work
- Concrete
- Masonry
- Carpentry